Properly the environmental signs throughout the SAC keeping track of urban area are recommended to get below: 1

Properly the environmental signs throughout the SAC keeping track of <a href="https://besthookupwebsites.org/escort/north-las-vegas/">https://besthookupwebsites.org/escort/north-las-vegas/</a> urban area are recommended to get below: 1

Climatological details towards the air temperature, dampness, piece of cake, rain and you will evaporation on Khachmaz section, and you will 2. Inflows so you can Deveci river and its own liquids levels 3. In of your overseeing areas all in all, 15 testing circumstances was advised to own hydrological observation, a lot more 5 testing factors is recommended make it possible for new monitoring of the fresh new groundwater regime. From the MMMC town brand new hydrological gauging products is actually chose in order to support water stability of your own ponds. This new collectors (K3 and you can K2) feeding the fresh new Ag gol and you will Sarisu ponds are noticed of the Q1 and you may Q6. The fresh outflows from the lakes will be observed from the Q4 and you can Q5. Most inflows from irrigation continuously liquids via P-1 and you may P-12-1 can be CES Asking Engineers Sakzgifter GmbH 3-24 P:UAZER5AiJRURENWRRIGAT1 ULENAUAN20001EIAREPORTFINALDOC Environment Comparison and you can Keeping track of on Investment Area of the fresh Samur Apsheron Canal while the Head Mill Mugan Enthusiast Overseeing monitored in the Q7 and Q8 correspondingly.

Brand new MMMC sea outfalls are ideal become tracked at Q9. Move guidance off one or two typical Kura gauges and you can from a single normal Araz gauge is highly recommended plus. Groundwater gauges is actually advised to assess the latest performance of your own the new MMMC enthusiast. About three gauges are positioned over the arrive at of the latest enthusiast (GW3, GW4 and you may GW5) plus one is situated close to the Karabakh Canal (GWl), a fifth you to definitely (GW2) is between the Kl and you will K2 debt collectors. Regarding SAC area a couple hydrological gauges try suggested to keep track of the newest hydrological . Therefore you to definitely station might be attached to the fresh new Shabranchay river so you’re able to gauge the inflows on river, a second station can be hung at the river to observe the newest fluctuation of their water level.

From the top section seepage losses as well as-supply of irrigation water would-be smaller, that have an effective feeling on the town: a diminished water table, smaller flat liquids ponds and you can a reduced threat of salinity

The brand new hydrological observations try planned to become been immediately after new utilization of the gauging stations, they must embark on for around 5 years pursuing the build has been accomplished. The brand new gauging channels shall be build during the earliest keeping track of strategy. The new overseeing plan was detailed inside Dining table step 3. It’s advised so you’re able to consume you to definitely hydrologist getting forty-five days for the fresh new co-ordination while the comparison of observations. Brand new hydrologist was energized to help you make this site different choices for the hydrometric and you can groundwater gauges through the cuatro weeks on initiation of one’s overseeing programme. Concurrently he will carry out 2 field travel (4 months overall) annually to each of the fresh new keeping track of parts to manage the latest field findings. For many river gpaign) a cable-car are going to be accessible to make it suspension dimensions across the the latest canals/rivers (cuatro altogether, except the brand new sampling activities on the river area) and you will a great topographic part (fifteen altogether) are going to be put-up.

Environmental Evaluation 2

year MMMC Ag gol, Q1, Q3 K2 Enthusiast, Q2 Water-level Every day 365 K3 Enthusiast Q4 Sarisu Q5, Q6 _ K2 Collector, Q2 Once per month assuming Ag gol, Q3 . water level hit so you can fifteen CES Consulting Engineers Salzgitter GmbH 3-twenty-five P:bAZERgALIURURENVURRIGATI12LENAUAN21000EIAREPORTFINALDOC Environmental Comparison and you can Monitoring regarding Investment Part of the Samur Apsheron Canal additionally the Fundamental Factory Mugan Collector Overseeing K3 Enthusiast Q4 Circulate (water level) limitation Sarisu Q5 P-step 1, Q7 P-12-1, Q8 MMMC sea outfall Q9 Kura, a couple gauges Araz, one to gauge Next to K2 collector, GWI Near to K2/KI enthusiast GW2, Near to Groundwater table Shortly after the 10 months thirty six the fresh new collector GW3, GW4 and you can GW5 SAC, Q5 Deveci River, Q4, Q5 water-level Twice daily 365 Near Deveci River Groundwater dining table After ten weeks 0 CES Asking Designers Salzgitter GmbH step three-twenty-six P:UAZERBALFlRURENVWRRIGAT1ULENAUAN20001EIAREPORTFINALDOC Ecological Evaluation and you will Monitoring from the Investment Part of the Samur Apsheron Tunnel as well as the Main Mill Mugan Collector MOt4TORING -v . ,; , :; .

The consequence for Sarisu Lake was a reduction of inflowing liquid. Just like the lake is very low, that is probably located over the groundwater top (as a result of the distance of one’s Kura River), there clearly was a risk the inflow about Ag-Gol lake is actually insufficient to steadfastly keep up the water harmony. There are no information away from inflows and you can outflows so you’re able to Sarisu Lake, which means this possibility can not be got rid of. An extra perception is the altering of around twenty five m3/s drainage liquid regarding left-bank outfall on the Caspian Sea towards the a lot more southern right-bank outfall. This is not considered an important factor, but track of the outfall part could be included (recommend below). SAMUR APSHERON Tunnel The Samur Apsheron Canal (SAC) has got the twin aim of sign out of water regarding the Samur Lake so you can donate to the needs of Baku Area as well as the Apsheron Peninsular also fulfilling the latest irrigation criteria out of 95,000 ha.

CES Asking Designers Salzgitter GmbH Conclusion – cuatro P:AAZERBALIRURENWRRJGAT112LENAUAN200CEIAAREPORTFINALDOC Environmental Review and you will Monitoring in the Investment A portion of the Samur Apsheron Canal and the Fundamental Factory Mugan Collector Exec Bottom line Process of one’s system get no high affect the latest Qusar Condition Protected City, this new Yalama Liana Pine Forest and/or Deveci Lagune. The fresh new Deveci Lake happens to be definitely influenced by irrigation, just like the load definitely serving the fresh lake is actually diverted to have local slight irrigation unconnected for the SAC program. Having increased government, plus the reduced amount of losses about SAC, the project could have a way to improve hydraulic techniques of the lake of the reduced total of the latest area’s significance of the newest regional stream having irrigation.

The fresh money can cost you do straight down so you’re able to approximately $US86,100 when the no GIS category could well be accompanied during the REMU. Therefore the brand new annual will cost you do drop slightly in order to on the $US25,100000. These costs are tentatively since the chatted about towards visitors. He’s centered on 1999 prices accounts and you can perform none imagine actual and you can price contingencies, nor do they envision costs for intemational luggage and you will tax/lifestyle. The cost deals are considered unimportant compared to full funds. In view associated with the the latest Agent suggests a beneficial GIS supplied REMU. This method is always to facilitate a modern-day data-handling and you will a competent enviromnental keeping track of. CES Contacting Engineers Salzgitter GmbH SUMEIAREPORTFINALDOC Environmental Evaluation and you may Overseeing within the your panels The main Samur Apsheron Canal together with Chief Mill Mugan Collector Desk Out-of Material Professional Summation Desk From Content step one Inclusion step 1-step one dos.

Within the last section overall keeping track of budget requires with the RIIDIA II Environment Monitoring System (REMS) was put. It suggests the newest put-right up can cost you in addition to operational can cost you toward a yearly basis. The brand new Annexes try organized according to the main chapters of this new report: Annex A matching to area 2. Ecological Comparison Annex B corresponding to section 3. Keeping track of Program The fresh minutes of around three personal visit group meetings was demonstrated from inside the Annex C CES Consulting Engineers Salzgitter GmbH step one-2 P:IAZERBALJ\RURENW RRIGAT112LENAUAN2OOOEIAREPORTFINALDOC Environment Comparison and Monitoring regarding the Project Area of the latest Samur Apsheron Tunnel additionally the Head Factory Mugan Collector Assessment dos. A standard evaluation of introduce ecological situation is done for the next sentences, these and additionally assess the asked aftereffects of your panels towards the environment.